Questions

What is difference between Trimix and PCC?

What is difference between Trimix and PCC?

Floor slope must be maintained in PCC work, which shall be laid above the stone soling. The thickness of the PCC shall be kept 100 mm. Trimix has to be done in the panel and each panel shall be of 3.5 meters and an appropriate steel bar shall be laid in layer two or one keeping the concrete cover of 50 mm.

How Trimix flooring is done?

VDF Flooring or Vacuum Dewatered Flooring or Tremix Flooring is a system for laying high quality concrete floors where the key is Dewatering of Concrete by Vacuum Process wherein surplus water from the concrete is removed immediately after placing and vibration, thereby reducing the water cement ratio to the optimum …

READ ALSO:   How do you germinate a peach seed?

What is a tremix?

A remix is a piece of media which has been altered or contorted from its original state by adding, removing, and/or changing pieces of the item. …

What is PCC flooring?

The term PCC stands for plain cement concrete. The mixture of cement, fine aggregate (sand) and coarse aggregate are generally called plain cement concrete (PCC).

Why we do groove cutting?

The purpose of the Groove Cutting is to weaken the slab along the approved line so that the slab cracks there instead of somewhere else. Their purpose is to distribute the load evenly between slabs thereby protecting the concrete along the joints.

What is the meaning of IPS flooring?

Indian Patent Stone
IPS flooring generally stands for Indian Patent Stone which is also considered as a cheap flooring. The constituent of this type of flooring is cement, admixture, down 10mm coloured/white chips mixed with required water of around 35-50 mm thick on rcc/pcc surface.

READ ALSO:   What was the problem with the Umayyad Caliphate?

What is RCC road?

Road having their wearing surface consisting of cement concrete slab are called as cement concrete road. Cement concrete roads are considered as most serviceable and rigid pavements.

What is fm2 flooring?

FM-2 CATEGORY FLOOR Typical floor use- Building containing wide aisle racking with stacking or racking over 8-m high, free movement areas and transfer areas. Property I limit (mm)- 3.5 (95\%) & 5.5(100\%) Property IV limit (mm)- 8.0(95\%) & 12(100\%)

What is mud mat concrete?

We use the term “Mud Slab” or “Mud Mat” to describe a concrete slab that is poured on the ground. This slab allows you to have a solid area from which to tie your forms down too. It also allows you to keep you rebar and formwork clean and out of the mud.

What is the difference between CC and PCC?

PLAIN CEMENT CONCRETE (PCC): – It is also called Cement Concrete (CC) or Binding Concrete. This is a construction material which consists of Cement, Sand, Aggregate (Coarse and Fine) , Water and Admixtures. It is also used as filler like lump concrete which is mixer of Boulder and PCC.