What is plant capacity factor in power system?
Table of Contents
What is plant capacity factor in power system?
Capacity factor is the measure of how often a power plant runs for a specific period of time. It’s expressed as a percentage and calculated by dividing the actual unit electricity output by the maximum possible output. This ratio is important because it indicates how fully a unit’s capacity is used.
What does plant load factor measure?
The Plant Load Factor is commonly considered as a measure of a power plant’s capacity utilisation. The Central Electricity Regulatory Commission defines Plant Load Factor as a percentage of energy sent out by the power plant corresponding to installed capacity in that period.
What is plant load factor in solar power plant?
Plant Load Factor is one of the performance parameter of a power plant. It is a degree of plant capacity utilization for a period of time. More the PLF, more will be the revenue of the plant. Alternatively, higher the PLF, lesser will be cost of per unit (kWh) energy generated.
What is the basic difference between plant capacity factor and plant use factor?
The load factor is the current \% of maximum capacity, an instantaneous value. The use factor is the percentage of a time period (day, week, etc) that it is utilized.
How is plant load factor calculated in power plant?
What is Plant Load Factor?
- Plant Load Factor (PLF) is the ratio of average power generated by the plant to the maximum power that could have been generated for a given time period.
- PLF = Pavg / Pmax…………….(
- As it is the ratio of same quantity, hence it is a unit less quantity.
What is the formula of power plant load factor?
The load factor percentage is derived by dividing the total kilowatt-hours (kWh) consumed in a designated period by the product of the maximum demand in kilowatts (kW) and the number of hours in the period. In the example below, the monthly kWh consumption is 36,000 and the peak demand is 100 kW.