Electrical Equipment Hydroelectric dams use alternators to convert mechanical energy (from the spinning turbine) into an alternating electrical current. Additionally, hydroelectric power stations also utilize transformers, so that the electrical current produced can be changed and transferred to the electrical grid.
What materials are needed for hydropower?
The major components of a hydroelectric plant are a river, dam, turbine, generator, and power cables. All the components work together to generate electricity. A river that typically has a large drop in elevation at some point is ideal for a hydroelectric plant.
Which type of instruments are used in power station?
Instrumentation for Boiler ancillaries viz. water treatment, electro-static precipitator, soot blower, economizer, de aerator, super heater, chemical dosing systems, air pre-heater, coal and ash handling systems, fuel storage and distribution, Bag House Filters.
How the hydroelectric power plant works?
Hydropower works by harnessing the energy that comes from the flow of water through a turbine connected to a generator, thus turning it into electricity. The water is used to turn a turbine, which is connected to an electric generator that distributes the power to the end users.
How do hydroelectric power plants produce electricity?
hydroelectric power, also called hydropower, electricity produced from generators driven by turbines that convert the potential energy of falling or fast-flowing water into mechanical energy. The turbines in turn drive generators, which convert the turbines’ mechanical energy into electricity.
What is the most important piece of equipment in the steam power plant?
A modern steam power plant has numerous electrical equipment. However, the most important tools are: Alternators: Each alternator is coupled with a steam turbine and converts the turbine’s mechanical energy into electrical energy.
What are hydroelectric dams?
Once a dam is built, water accumulates behind it to form a lake or dam reservoir. While dams are built to stop flooding and facilitate shipping, they may also be intended to generate electricity, and these are called hydroelectric dams. Such a structure is an essential part of a hydroelectric project.
What is the role of control and instrumentation in power plant?
Instrumentation and control systems play an important role in nuclear power plant uprating projects. Significant changes to the plant control, protection or monitoring systems will necessitate corresponding changes to the Human-System Interface in the Main Control Room and possibly in other control centres.
How many types of electrical measuring instruments are there?
List of electrical and electronic measuring equipment
Name | Purpose |
---|---|
Ammeter (Ampermeter) | Measures current |
Capacitance meter | Measures the capacitance of a component |
Current clamp | Measures current without physical connection |
Curve tracer | Applies swept signals to a device and allows display of the response |