Common

What means headwork?

What means headwork?

Definition of headwork : mental labor especially : clever thinking.

What is the role of penstock in hydropower plant?

A penstock is a sluice or gate or intake structure that controls water flow, or an enclosed pipe that delivers water to hydro turbines and sewerage systems.

What is headwork and its types?

Canal Headworks are classified to: 1. Diversion Headworks: A weir or a barrage is constructed across a river to raise water level and to divert water to a canal is known as a diversion headwork. 2. Storage Headworks: A dam is constructed across a river valley to form a storage reservoir is known as a storage headwork.

What is headwork in irrigation?

Headworks is a facility withdrawing water from irrigation sources to the main canal in the volume and time required for irrigation in accordance with the relevant water use schedule. Water intake facilities, or headworks, are constructed for withdrawing water from a river (or reservoir) to the main canal.

READ ALSO:   At what pressure does the relief valve open?

What is headwork in civil engineering?

A headwork raises the water level in the river. It regulates the intake of water into the canal. It also controls the entry of silt into the canal. A head work can also store water for small periods of time.

What is linked canal?

The Marala–Ravi Link Canal (MRL canal) is a canal in Pakistani Punjab that flows from the Marala Headworks on the Chenab River near Sialkot to the Ravi river. It was constructed in 1956 to transfer water from Chenab to Ravi as well as to irrigate about 60,000 hectares of land in the Sialkot and Gurjanwala districts.

What are the component parts of diversion headwork?

Components of Diversion Head Works | Irrigation | Agriculture

  • Component # 1. Weirs:
  • Component # 3. Divide Wall:
  • Component # 4. Fish Ladder:
  • Component # 5. Log Chute:
  • Component # 6. Main Canal Head Regulator:
  • Component # 7. Regulation of Head Regulator:
  • Component # 8. Silt Control at Head Regulator:
READ ALSO:   Does NYU have a strong alumni network?

What are the component parts of canal headwork discuss with sketch?

Top 5 Components of Canal Headwork (With Diagram)

  • Weir or Anicut: A weir is an obstruction or a barrier constructed across the river.
  • Divide Wall: As the name indicates it is a long solid wall or a groyne.
  • Under Sluices or Scouring Sluices:
  • Fish Ladder:
  • Silt Control at Headwork’s:

What are the function of diversion headwork?

Diversion head works like Weir or barrage is constructed across a perennial river to raise water level and to divert the water to canal, is known as diversion head work Flow of water in the canal is controlled by canal head regulator.

What is RD in canal?

The Indira Gandhi Canal (originally, Rajasthan Canal) is the longest canal of India. The main canal is 445 km long which is 1458 RD (RD represents reduced distance).