What is the procedure of pile foundation?
Table of Contents
What is the procedure of pile foundation?
how piles are constructed
- hammer a thin-walled steel tube into the ground.
- remove all earth left inside the tube.
- lower a steel reinforcement cage into the tube.
- cast the pile by pouring wet concrete into the tube.
What is Broms method?
One of the most common and simplified method is proposed by Broms (1965) that determines the lateral load capacity and pile deflection at ground surface. Broms uses several graphical charts to obtain ultimate bearing capacity and lateral deflection.
What is pile foundation design?
The design of pile foundation involves providing adequate pile type, size, depth, and number to support the superstructure load without excessive settlement and bearing capacity failure. The resistance to the applied structural load is derived mainly from the frictional resistance developed at the soil–pile interface.
How do you make a pile cap foundation?
Pile caps can be designed using the truss analogy or using the bending theories. Mostly, up to the four numbers of piles are connected by a pile cap to support the concentrated load from the superstructure, truss theory is used to design the pile caps.
How do you make a concrete pile?
Cased concrete piles are made by driving a steel casing into the soil. In this case, the mandrel is placed inside the casing. After reaching desired depth, the mandrel is withdrawn, and the casing is filled with concrete. In the case of the uncased piles, the casing will be gradually withdrawn.
What is short pile and long pile?
Short-pile carpets are defined as carpets that are thin. Usually the thickness of the fibres in the warp and weft is taken as a reference, and short-pile carpets are considered to be up to one and a half centimetres thick. If the carpet is thicker, it is referred to as a long-pile carpet.
How do piles resist lateral loads?
Pile foundations usually find resistance to lateral loads from (a) passive soil resistance on the face of the cap, (b) shear on the base of the cap, and (c) passive soil resistance against the pile shafts. The latter source is usually the only reliable one.
What is pile layout?
A Piling Layout is a deliverable document of the Detailed Design and Engineering developed by a CSA (Civil) discipline that identify capacities, locations, and cut-off elevation of piles.
Is code for design of pile foundation?
Following are the Indian Standard Codes on Pile Foundations: IS 2911 : Part 1 : Sec 1 : 1979 Driven cast in-situ concrete piles. IS 2911 : Part 1 : Sec 2 : 1979 Bored cast-in-situ piles. IS 2911 : Part 1 : Sec 3 : 1979 Driven precast concrete pile.
How do you make a pile cap for a single pile?
IMHO, for a single pile pilecap, the size is fixed based on pile size and column size (6″ on all sides from pile and 2″ on all sides from column – whichever is more critical). The depth of the pilecap is determined by required anchorage length for column bars and pile bars.
How do you pour a concrete pile foundation?
Remove any sections that come out of the pile borehole. Pull out the tremie pipe after the concrete reaches the top of the pile. After that, remove the temporary casing with necking and shearing of the poured concrete. Finally, fill the top part of the pile with concrete up to 15cm above cut-off levels, Fig.