How did the public opinion of nuclear power in Japan change after the Fukushima disaster?

The results were as follows: (1) negative opinions towards nuclear power generation (NPG) suggesting ‘abolition or reduction,’ which was 20\%–30\% over the past 30 years, increased to 70\% from four to six months after the accident, when there was also much news about renewable energy.

What changed after Fukushima?

The enhancements included: adding capabilities to maintain key plant safety functions following a large-scale natural disaster; updating evaluations on the potential impact from seismic and flooding events; new equipment to better handle potential reactor core damage events; and strengthening emergency preparedness …

Does Germany have nuclear reactors?

At the end of 2021, Germany will shut down three of the last six remaining German nuclear reactors. At the Gundremmingen facility in Bavaria, one of the units ceased operation in 2017. Now the last unit will be shut.

READ ALSO:   Are Fall Guys Stumble Guys?

How has Japanese public opinion about nuclear power changed?

Japanese Opinion Poll Finds That Views on Nuclear Power Turn Slightly Positive. On March 17, the Japan Atomic Energy Relations Organization (JAERO) released the results of its latest nationwide public opinion survey on nuclear power, conducted in FY19 (April 2019 to March 2020).

Is the Fukushima reactor still active?

In April 2012, Units 1–4 were shut down. In April 2021, the Japanese government approved the dumping of radioactive water of this power plant into the Pacific Ocean over the course of 30 years. The sister nuclear plant Fukushima Daini (“number two”), 12 km (7.5 mi) to the south, is also run by TEPCO.

How many reactors were at Fukushima?

six
The Fukushima Daiichi Nuclear Power Plant comprised six separate boiling water reactors originally designed by General Electric (GE) and maintained by the Tokyo Electric Power Company (TEPCO).