Here are the steps to make sure you bond new concrete with old concrete correctly: Drill ⅝ diameter holes to be 6 inches deep into the old concrete. Be sure to drill the holes 12 inches on center. Place the holes horizontally if the joint is wider than it is tall, but place then vertically if it is taller.

Can we join two slabs?

Joining slabs involves creating a joint that both structurally connects the slabs and provides a flexural point to accomodate how the different ages of the slab will respond to climate and stress. While it sounds complicated, the proces to join two concrete slabs is easy but might take a few attempts to get it right.

READ ALSO:   How is reason used in ethics?

How can we extend an existing RCC slab?

The existing slab should be chipped out to expose the re-bars. The length of re-bars thus exposed should be at least be sufficient to develop the bond length. For every bar exposed new bars from the new slab side should be tied. Prepare the existing concrete surface to bond to the new concrete that will be placed.

Does new concrete stick to old?

A bonding agent (bonding adhesive) needs to be painted onto the existing concrete first to ensure that the fresh concrete will successfully adhere. This is also true of floor repairs, if concrete is used to fill gaps caused by damage. The new won’t adhere to the old without the help of a bonding adhesive.

How do you extend a slab?

To Extend a Slab/Roof Slab

  1. Select the slab or roof slab to be extended. If the object selected is…
  2. Select the target wall, slab, or roof slab to which the slab or roof slab is to be extended.
  3. Select the slab or roof slab to be extended.
  4. Select the first edge to lengthen.
  5. Select the second edge to lengthen.
READ ALSO:   Why is I2 a solid while F2 is a gas?

How do you fix a crumbling concrete slab?

To repair deeper concrete defects or to replace chunks of missing concrete, just add small stones to your mix. The ratio should be three parts stone, two parts sand and 1.5 parts Portland cement for a strong mix. Always use the cement paint to bond your new concrete to your old.