Trendy

How much is construction cost per sq ft in Coimbatore?

How much is construction cost per sq ft in Coimbatore?

Straight answer : Rs 1500/= per sft for Ground floor and Rs 1400/= per sft for First floor is a reasonable win-win price which can give you a good quality residential construction (includes putty finish of all inner walls) with excellent grade construction, floor and wall tiles, plumbing and electrical materials used.

What is the Labour cost for construction?

Labour rate per square foot:– In india, Labour rate & cost per square foot is around 210 to 300 Rs for Residential/ commercial/ institutional building, it contains labour cost approx 140 to 200 Rs per square foot for building a structure or civil work and around 70 to 100 Rs per square foot for finishing like tiling.

READ ALSO:   What is the best supplement to take after a workout?

What is the land value in Coimbatore?

Property Rates & Price Trends in Coimbatore

Locality Name Buy Rates Rental Rates
Price Range (Rs. per sq. ft.) 3 Bedroom
Saravanampatti Rs. 3,612 – 4,462/sq. ft. Rs. 11,722 – 15,238
Selvapuram Rs. 3,995 – 4,675/sq. ft. Rs. 12,343 – 15,191
Singanallur Rs. 3,910 – 4,802/sq. ft. Rs. 15,086 – 17,600

How is labor percentage calculated?

Divide labor cost by total operating costs For example, if labor costs $9,000 per month and total operating cost is $15,000 per month, divide $9,000 by $15,000 to get 0.6. Multiply by 100. This final number is your restaurant’s labor cost percentage. In this example, it’s 60\% of the total cost of doing business.

What is the Labour rate for building work in India?

The Labour rates list or Labour charges for residential construction starts from Earth work: Rs 12/cft | Shuttering: Rs 65/sft | Bar bending: Rs 12/kg | Block work: Rs 30/sq ft | Plastering: 20/sft | Tiling: Rs 20/sft. What is the Block/Brick work Labour rate per sq ft?

READ ALSO:   Why is tackle more important than guard?

What are the different works done by labour contractors in Bangalore?

Some of the works done by Labour contractors in Bangalore include Brickwork, Centering work, Earthwork, Slab casting, Bar bending, Plastering, Window & Door fixing, Concreting, etc. What are the different Labour contractors required for Building a House?

What is the ratio of labour to material cost in construction?

Such works usually have a 50\% ratio between labour and materials. An average residential house construction will tend to have the usual 30\% labour versus 70\% material costs. Within the construction, some tasks will have more \% of labour than others.

What are the different labour contractors for house construction?

The different Labour contractors that can be hired for house construction include Civil work, Electrical work, Plumbing work, Flooring work, Painting work, Plastering work, Concreting, etc. What is the Labour rates/Labour contractor rates for Shuttering, Bar bending, Electrical, Plumbing, Flooring?